RESO 2026.09 Authorizing and Approving Three Change Orders to the Contract for Construction between the Town of Golden Beach and Southeastern Engineering Contractors, Inc Home / Documents / Attachments Resolution-No.-2026.09-Authorizing-and-Approving-Three-Change-Orders-to-the-Contract-for-Construction-between-the-Town-of-Golden-Beach-and-Southeastern-Engineering-Contractors-Inc.pdf File size: 661.31 KB